Rainscreen cladding systems stonew4/13/2023 The joints between courses can either be left as expansion gaps or filled with a matching stone mortar grout. Pin holes are usually drilled on site by the fixing team. It takes a specialist fixing team to apply dowel pins to each stone piece anchored to SFS or block substrate.ĭowel pins such as the one illustrated here serve to hold back an entire floor level before horizontal is needed. ![]() The load bearing fixing can be anchored with a pistol back rebate to the bed of the stone cladding. The stone is held back by restraint fixings with horizontal load bearing being situated every floor or every other as determined by a specialist structural engineer. Traditional handfixing the stone is still the most common use in cladding, particularly in the North of England and Scotland. The design choices for anchoring can be determined by the style and use of the building. ![]() ![]() The two main types of anchoring back stone in the construction of large buildings is either: 1) traditional handset (also known as “ashlar”), where the stone pieces are held back by fixings and applied in courses, or: 2) rainscreen, where the stone is positioned on a metal railing system.
0 Comments
Leave a Reply.AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |